Basement Update

Posted in General on March 21st, 2019 by James

Over two weeks into the basement, and I’m ready to get our basement back. We’ve made some good progress on it. Got the wall done, two coats of primer, paint, and new lights installed. Saturday we got Ben, Jim, and Matt coming over to get the flooring installed. I hope to get a good portion of it done. Would love to have the flooring done this weekend, then next weekend, the last bit of it. Still have the actual flooring to lay down, baseboards, and door casings. But soon, we should have our basement back. I’m guessing we’ll be 100% done come this weekend.